The project, under the special programme for adaptation to climate change: implementation of adaptation measures project, consisted the construction of a hybrid rainwater harvesting system for the flushing of toilets and replenishing the swimming pools – inclusive of storage tanks, valves, pumps and expanded pipe network, and a wastewater recycling irrigation system, inclusive of a sprinkler system, storage tank and pumps, at the second largest water consumer in the south of the island – Coconut Bay Beach Resort and Spa.
Dannion provided full engineering services including structural, infrastructural, hydrological, electrical and mechanical up to Development Control Authority Approval; and tender document and contract management services.