2010 - Vieux-Fort, St Lucia

Water Conservation at Coconut Bay Resort

Categories
Hospitality

The project, under the special programme for adaptation to climate change: implementation of adaptation measures project, consisted the construction of a hybrid rainwater harvesting system for the flushing of toilets and replenishing the swimming pools – inclusive of storage tanks, valves, pumps and expanded pipe network, and a wastewater recycling irrigation system, inclusive of a sprinkler system, storage tank and pumps, at the second largest water consumer in the south of the island – Coconut Bay Beach Resort and Spa.

Dannion provided full engineering services including structural, infrastructural, hydrological, electrical and mechanical up to Development Control Authority Approval; and tender document and contract management services.

Water Conservation at Coconut Bay Resort

St Lucia

View map
  • Appointment 2009
  • Completion 2010
  • Property Area 85 acres
  • Capacity 500
  • Client Caribbean Community Climate Change Centre and Coconut Bay Beach Resort and Spa
  • Sustainability Design
  • Structural Engineer
  • MEP Engineer
  • Hydrological Design